What is an ASTM2846 CPVC Reduce Tee?
A CPVC reduce tee is a three-way pipe fitting designed to connect pipes of different diameters. Made from chlorinated polyvinyl chloride (CPVC), these fittings meet ASTM2846 standards for hot and cold water distribution systems.
The reduce tee allows smooth water flow between a main line and a smaller branch line. Its unique design prevents turbulence and maintains optimal pressure throughout your piping system.
Key Benefits of ASTM2846 CPVC Reduce Tee
Superior Temperature Resistance
CPVC reduce tees withstand temperatures up to 200°F (93°C). This makes them ideal for hot water applications where PVC would fail. The material maintains structural integrity under thermal stress.
Химическая стойкость
These fittings resist corrosion from chlorinated water. Unlike metal alternatives, CPVC won’t rust or deteriorate over time. Your system stays clean and efficient for decades.
Easy Installation
Solvent welding creates permanent, leak-proof connections. No threading or special tools required. Installation time is significantly reduced compared to metal fittings.
Cost-Effective Solution
Factory direct pricing eliminates middleman markup. You get premium quality at wholesale prices. Long service life means lower replacement costs.
Applications for CPVC Reduce Tee Fittings
Сантехника для жилых помещений
Perfect for hot water distribution systems in homes. Connects main supply lines to individual fixtures. Reduces pipe diameter where lower flow rates are needed.
Коммерческие здания
Ideal for hotels, hospitals, and office buildings. Handles high-pressure applications reliably. Meets building codes in most jurisdictions.
Industrial Applications
Chemical processing plants benefit from CPVC’s resistance properties. Food processing facilities appreciate the non-toxic material. Pool and spa systems rely on chlorine resistance.
ASTM2846 Standard Compliance
The ASTM2846 specification ensures consistent quality and performance. All fittings undergo rigorous testing for:
- Hydrostatic stress capability
- Thermal expansion characteristics
- Chemical resistance properties
- Dimensional accuracy
- Material composition
Our factory maintains strict quality control throughout production. Each batch receives certification before shipment.
Size Options and Specifications
Common Configurations
- 1″ x 1″ x 3/4″ reduce tee
- 1-1/4″ x 1-1/4″ x 1″ reduce tee
- 1-1/2″ x 1-1/2″ x 1″ reduce tee
- 2″ x 2″ x 1-1/2″ reduce tee

Custom Sizing Available
Our factory produces non-standard sizes on request. Minimum order quantities apply for custom configurations. Lead times vary based on specifications.
Installation Guidelines
Preparation Steps
Clean pipe ends thoroughly before assembly. Remove burrs and debris from cut surfaces. Test fit components before applying solvent.
Процесс присоединения
Apply primer to both surfaces. Use appropriate CPVC solvent cement. Insert pipe fully into fitting socket. Hold firmly for 30 seconds minimum.
Curing Time
Allow 2 hours before pressure testing. Full cure strength develops within 24 hours. Temperature affects curing speed significantly.
Quality Assurance at Yifan Pipeline Factory
Manufacturing Excellence
State-of-the-art injection molding equipment ensures precision. Automated quality control systems monitor every step. ISO certification validates our processes.
Material Sourcing
We source premium CPVC compounds from certified suppliers. Raw materials undergo incoming inspection. Only approved batches enter production.
Testing Protocols
Hydrostatic testing verifies pressure ratings. Dimensional inspection confirms ASTM compliance. Chemical resistance testing ensures long-term performance.
Why Choose Factory Direct Sales?
Eliminate Middlemen
Direct purchasing cuts costs dramatically. No distributor markup means better pricing. Faster delivery from our warehouse to your project.
Custom Solutions
Our engineering team develops specialized fittings. Modify existing designs to meet unique requirements. Prototype development available for large projects.
Technical Support
Expert assistance with product selection. Installation guidance from experienced professionals. Post-sale support ensures project success.
Ordering Information
Minimum Orders
Standard sizes: 100 pieces minimum. Custom configurations: 500 pieces minimum. Mixed orders accepted for established customers.
Lead Times
Stock items ship within 48 hours. Custom products require 2-3 weeks production. Rush orders available with expedited fees.
Packaging Options
Individual poly bags for small quantities. Bulk cartons for large orders. Custom labeling available upon request.
Competitive Advantages
Price Leadership
Factory direct pricing beats competitors consistently. Volume discounts available for large projects. Long-term contracts offer additional savings.
Quality Guarantee
All products backed by comprehensive warranty. Defective items replaced at no charge. Performance guarantee for specified applications.
Global Shipping
Worldwide delivery capabilities. Multiple shipping options available. Tracking information provided for all orders.
Contact Yifan Pipeline Factory
Ready to order your ASTM2846 CPVC reduce tees? Our sales team provides personalized quotes quickly. Experience the difference of factory direct purchasing.
Visit ifanpro.com for complete product catalogs. Download technical specifications and installation guides. Request samples for evaluation projects.
Transform your piping projects with premium CPVC fittings. Choose reliability. Choose quality. Choose Yifan Pipeline Factory.
Последние комментарии