Can This PEX Coil Cover the Next Two Radiant Floor Loops?

A coil marked 500 ft can look long enough on the purchase order and still leave the last radiant floor loop short. Allocate each approved loop to a single verified continuous length of the specified PEX, including its leaders and any separate cutting allowance. After each cut, record the remaining length against that coil’s ID. That record tells the next installer whether the remainder can cover an approved run and lets purchasing see what still needs to be ordered.

Start with the approved full loop length

Pull the takeoff revision and the manifold schedule. Get each loop ID and its full installed length. Check whether the takeoff includes the tubing running from the manifold to the heated area and back. If the schedule lists those leaders separately, add both. If it already includes them, carry the listed total straight into the allocation.

In Step 9 of Uponor’s design manual, an example uses 176 ft in the heated area and 45 ft for the two leaders combined. The installed loop total is 221 ft. Use the approved schedule for your own job and add any separate cutting allowance only if it is absent from that schedule. Take changes to the approved layout or loop length back through design review.

Enter the system, nominal tube size and any specified barrier requirement beside the length. Ask for the exact offered coil SKU, nominal roll length, coil or lot identification, and how its markings can be read. Ask purchasing to confirm the minimum order and the lead time for that particular offer if a second coil may be needed. The PEX underfloor heating guide covers the upstream choices about barrier tubing, sizing and layout.

Manifold and tubing in a library illustration.
Use the manifold schedule to identify the affected loop. This library illustration shows the context of a manifold review.

Allocate two continuous cuts to one coil

Keep the catalogue length and the measured or otherwise verified usable length in separate columns. Uponor’s coil listing includes a nominal 500-ft, ½-in Wirsbo hePEX coil, item A1260500. A reel that has already been opened needs its own length check. Set aside any portion that the approved inspection or supplier instructions rule out, and budget only from the continuous stock left for the next cut.

If the tube carries markings, verify their direction, units and increment before using the difference between readings. The Viega Climate Mat manual documents incremental footage markings on its specified tubing. Other products can use a different scheme. For a part-used coil, an endpoint number identifies a mark. You need a verified difference between two readings, or a reliable direct measurement, to establish the usable length.

Two similar-looking white tubing coils in a library illustration.
Compare marked product identity and measured usable length before assigning a coil. Similar-looking stock can represent different items.

Use this example for the arithmetic. A nominal 500-ft coil has 497 ft of verified continuous usable stock. Loop A uses the 221-ft installed total from the Uponor example. Assume the approved total for Loop B is 230 ft and the project allows 3 additional ft for each cut. The usable stock and all inputs other than the cited nominal coil and 221-ft example are teaching assumptions.

Illustrative allocation from 497 ft of verified usable tubing
LoopInstalled (ft)Extra trim (ft)Planned cut (ft)Remaining (ft)
A2213224273
B230323340

Starting length minus planned cuts gives 497 − 224 − 233 = 40 ft. Suppose the next eligible loop needs 41 continuous ft, with any separate allowance already included. It cannot be assigned to that remainder. Keep the 40-ft piece identified for a different approved use and allocate stock from another matching coil for the 41-ft job.

Verify matching continuous stock before cutting. Record the actual cut and label the remainder, or hold the allocation.
Check matching continuous stock before cutting. Hold an allocation that cannot be covered, then confirm another matching coil. Open full-size diagram.

Record the actual cuts and release the remainder

Keep the worksheet at the coil while work is in progress. After each cut, record what was consumed, what was trimmed off or set aside, and the verified continuous length remaining. If 225 ft was consumed for Loop A instead of 224 ft, the budget for the next cut starts at 272 ft. With Loop B unchanged, the expected remainder drops to 39 ft. Update the record before offering that piece to another crew.

  1. Identify the source. Record the tubing system, size, barrier where specified, manufacturer lot and original coil ID. If the package tag will be discarded, transfer its identifying information first.
  2. Record the cut. Keep the manifold and loop ID, approved takeoff revision, required cut length, actual consumption and the measured remainder. Retain the measurement or marking reference where it helps another installer reproduce the reading.
  3. Assign a disposition. Identify an approved use, retain the piece as identified stock, or put it on hold when the length, condition or identity cannot be confirmed. Record who accepted it and where it went.
Orange tubing with a printed PE-RT material mark and a 16 × 2.0 mm size mark.
This tube is marked PE-RT. If the approved schedule specifies PEX, exclude this piece from the allocation. Use the printline and coil tag to confirm the material and identity of the stock you cut.
Copyable remainder record
FieldRecord to keep
SourceCoil ID, product, lot and required tubing specification
CutLoop, takeoff revision, required cut and actual consumption
RemainderVerified continuous length and how it was measured
DispositionAssigned use or hold, location and accepting owner

Send purchasing the approved tubing specification and the unassigned loop lengths. Bring the measured remainder record if you want to use existing stock. Trade buyers can review IFANPRO’s oxygen-barrier PEX range and ask the supplier to confirm which coil sizes and identification details are available for their schedule. Confirm the specific offer before using it in the cut plan.

Summary

Label the remainder with its coil ID and verified continuous length. Check it against the next approved cut, and send purchasing any unassigned cut lengths and the required tubing specification.

Frequently asked questions

Does the cut length include the tubing back to the manifold?

Yes. Use the approved full loop length, which includes both leaders, and add a cutting allowance only where the schedule calls for one separately.

Can I reserve a part coil for a later loop?

Reserve it after checking its identity, condition and continuous usable length against an approved loop. Label it and leave the measurement and disposition in the handoff record.

How do I check the remaining length if only one endpoint mark is readable?

Measure the remaining continuous stock directly. One readable mark gives a position on the tube. Record the measurement method with the coil ID.